M/V Shibumi Web

Click this thumbnail  to see more photos of Shibumi.

Home

About Shibumi
Specifications

   Layout
Boat Photos
Owners Notes
History
Fun Photos

 Winter Work '09-'10 

  Winter Work '08-'09

  Winter Work '07-'08

  Winter Work '06-'07

  Winter Work '05-'06

  Winter Work '04-'05

Charters
Bareboat
Training

Links

Contact Info

winter work '08-'09

If the work were ever done the project would cease to be fun. We are looking forward to another year of improvements to Shibumi. The following are the items on the current schedule and if you have anything you think we should add send me a note. Captain Bill

In addition to routine maintenance, the list of projects we completed are as follows:

Plumbing

bulletNew shower drains and lines for the VIP Stateroom and Bunk Room
bullet

Electronics/Electrical

bulletInstall new VHF radio on Dinghy
bulletNew fire extinguisher for Dinghy
bulletInstalled battery charger and deck mount plug-in for Dinghy.
bulletInstall new Navigation Computer with remote on/off next to GPS.
bulletUpgrade Navigation Software to VHS Max Pro
bulletUpgrade all Navigation Charts to C-Map versions for Max Pro Series
bulletReplace all Thermostats with dial type and on/off switch.
bulletInstall Alpine Stereo in wheelhouse with input for iPod, USB thumb drive and AUX
bulletReplace start bank batteries with (2) 8D 1400cca
bullet

Deck Hardware

bulletReplace 30kg Bruce main anchor with 50kg Super Claw.
bulletRemark anchor chain and turn end for end.
bulletReplace Davit Cable with Amsteel Blue line.
bullet

Mechanical

bulletRebuild Port Generator, including starter, alternator, sound enclosure, and Heat Exchanger
bulletRebuild Starboard Generator, including starter, alternator, sound enclosure and Heat Exchanger
bulletReplace Main impellers
bulletTuned props during haul-out
bulletFinish Roppe rubber floors in engine room.
bullet

Exterior Finish

bulletStrip and Varnish California Deck doors.
bulletInstall new hinges and locksets on California deck doors.
bulletRebuild Wheelhouse doors with full length piano hinges and latch hardware.
bulletMatch all entry keys for Salon door and two wheelhouse doors.
bulletPaint cockpit.
bulletBottom Paint
bullet

Interior Finish

bulletAdd new table top in Wheelhouse
bulletGranite Counters for Galley
bulletFluorescent 12v lighting under galley counters.
bulletReplace Galley Stove with new Princess 3-Burner Euro
bulletReplace Shower Door in VIP head.
bulletReplace Shower Door in Bunk Room head
bulletRefinish stairs to Master/Engine Room
bullet

To see a list of past years upgrades click Winter '04'-05 , Winter '05-'06 or Winter '06-'07or Winter '07-'08

Hit Counter

Home About Shibumi Charters Current Winter Work

Send mail to Bill or Fred with questions or comments about Shibumi, the charters, information or this web site. 
Last modified: 12/30/09

All pictures and contents of this website property of Bill & Fred's Excellent Adventures, LLC. All rights reserved.  The pictures and content may not be copied or duplicated in printed or electronic form without the express written consent from the owners.