M/V Shibumi Web

Click this thumbnail  to see more photos of Shibumi.

Home

About Shibumi
Specifications

   Layout
Boat Photos
Owners Notes
History
Fun Photos

Winter Work '08-'09

  Winter Work '07-'08

  Winter Work '06-'07

  Winter Work '05-'06

  Winter Work '04-'05

Charters
Bareboat
Training

Links

Contact Info

winter work '06-'07

For the Winter of '06/'07 brings a more cosmetic list to  Bill & Fred's work on Shibumi.  The majority of the upgrade and technical work is completed.  We have some fine tuning but this is the year to spruce up the appearance.  As always it is our desire to help you create lasting memories in cruising, we are constantly looking for ways to upgrade Shibumi to go beyond your expectation.

Please send us suggestions on what would make your time with us easier, better or more enjoyable.

If there are items you feel would add to the cruising enjoyment of Shibumi please email bill@mvshibumi.com.

Plumbing

bulletHot and Cold fresh water sink in Cockpit
bulletReplace galley faucet with stainless
bulletIncreased Holding Tank Capacity to 106 gallons by replacing old tank with two new tanks. Forward tank for Bunk and VIP Staterooms and Aft tank for Master Stateroom and Day head. Special thanks to Fred the plumber.
bulletNew water line for bow anchor freshwater wash down.

Electronics/Electrical

bulletRadar maintenance to improve target acquisition. Wow, I didn't know it could be so much better.
bulletInstall new house  batteries.  We chose 8-L16HC 6 volt batteries.  Wired in a combination series/parallel configuration we now have 1660 amp/hours at 12 volts
bulletRelocate the house battery bank from the engine room to the Lazarette. This decision was made to relocate the 1,000 pounds of batteries from midline in the engine room to the starboard side aft to transfer weight.
bulletComplete rewire of cockpit and lazarette. Cockpit panel with drop down lid with switches for new Lazarette lighting, Cockpit LED lighting, DC outlet in panel, Down Riggers, Seawater wash down and Stern Windlass.
bulletAdded 110v GFCI outlet in cockpit.
bulletChanged overboard discharge timer location from engine room to day head.  Added switch to select Forward or Aft tank and tank monitor for both.

Deck Hardware

bulletTwo New portlights in bunkroom
bulletMoved BBQ from flybridge to Cockpit.

Mechanical

bulletRepaint engines to "Caterpillar Yellow"
bulletNew Navy Blue rubber floor in engine room
bulletNew Alternators on main engines Leece-Neville 90 amp output (replacing 50 amp output)
bulletFlush and bleed entire Hynautic engine control system
bulletInsulate bow thruster
bulletR & R Stabilizer fins to replace exterior seals (scheduled maintenance)
bulletCustom fabrication for 2nd 20 gallon hot water tank plumbed in series.

Exterior Finish

bulletFull width Black Galaxy granite counter in cockpit with sink.
bulletRepainted Cockpit Cabinets and installed custom door cabinet in center.
bulletAll new exterior cushions on flybridge
bulletAll new cushions in California Deck
bulletNew stair tread on ladder to Fly from California Deck
bulletStripped brown paint from California Deck and sealed clear.
bulletStripped upper and lower rub rails to bare wood and refinish.
bulletRebuilt lid for flybridge instruments.

Interior Finish

bulletNew 12" memory foam mattress's in the Master and VIP staterooms
bulletNew bedding & Decorations in bunk room
bullet"Hypervent" for under mattress ventilation

To see a list of past years upgrades click Winter '04'-05 or Winter '05-'06

Hit Counter

Home About Shibumi Charters Current Winter Work

Send mail to Bill or Fred with questions or comments about Shibumi, the charters, information or this web site. 
Last modified: 11/03/08

All pictures and contents of this website property of Bill & Fred's Excellent Adventures, LLC. All rights reserved.  The pictures and content may not be copied or duplicated in printed or electronic form without the express written consent from the owners.